Day 2 and the bathroom guy is having trouble with the floor. It slopes a lot evidently and it’s obviously causing more problems that he’d originally envisaged. I’m beginning to wonder how the original estimate will actually shape up vs. the eventual bill!
Im also slightly worried, being abroad currently, about the above photo showing work thus far. Slightly concerned there’s nothing holding up the right hand side of the floor and the lathe and plaster wall. Will have to call the Bathroom guy tomorrow methinks..